ISOIL ML 255-BOB2A5AO

Key Information:

  • Process executed name: SUTEL Homologation
  • Description:
    mandatory tests from the official regulatory entity SUTEL with the objective to validate that the device works in every carrier's network as it is stated in their technical data sheet.
  • Date of conclusion: 16-09-2013
  • Tests executed: Protocolo de pruebas SUTEL
  • Client:
  • Function:
    it measures the water flow through a system and sends email reports with the consumption in a certain period of time.